Cockenzie Coal Power Plant

Cockenzie Coal Power Plant is a coal-fired power station in East Lothian, Scotland, capable of co-firing biomass. It is situated on the south shore of the Firth of Forth, near the town of Cockenzie and Port Seton, 8 mi (13 km) east of the Scottish capital of Edinburgh. The Cockenzie Coal Power Plant has dominated the local coastline with its distinctive twin chimneys, since it opened in 1967. Initially operated by the nationalised South of Scotland Electricity Board, it has been operated by Scottish Power since the privatisation of the industry in 1991. In 2005 a WWF report named Cockenzie as the UK's least carbon-efficient power station, in terms of carbon dioxide released per unit of energy generated. The 1,200 megawatt power station is set to close by 2016, but there are plans to replace the current station with a Combined Cycle Gas Turbine (CCGT) power station.

Since 1991, the Cockenzie Coal Power Plant has been owned by the privatised Scottish Power utility group. It recently surpassed its originally intended lifespan. It is now run as a 'marginal station', guaranteeing seasonal and peak supply and non-availability of other power stations. For this reason considerable investment has been made to improve start-up times to maximise generating opportunities in the deregulated electricity generation market. Since 2001, the station has exported electricity to Northern Ireland via an undersea power link.

CCGT replacement

The Cockenzie Coal Power Plant must close by 31 December 2015, so Scottish Power are currently considering replacing it with a Combined Cycle Gas Turbine (CCGT) power station. If the station is built, it will require a 17 km (11 mi) gas pipeline from East Fortune, to supply it with fuel.

Coal transportation

Coal was originally supplied to the station directly from the deep mines of the neighbouring Lothian coalfield, but these have since been exhausted or closed. Subsequently coal has been supplied from open cast mines in the Lothians, Fife, Ayrshire and Lanarkshire.

The power station was the first to use the new "merry-go-round" system of coal deliveries by rail. This system uses hopper wagons which carry around 914 tonnes of coal each. This coal is delivered to the station's coal store, which has the capacity to hold up to 900,000 tonnes of coal. The coal store is situated on the opposite side of B1348 road between Prestonpans and Cockenzie and Port Seton, to the rest of the station. Coal is transported from the coal store to the station's boiler house by a conveyor belt. It is then weighed, sampled and screened, before being pulverised in a pulverising mill. It is then blasted into the station's furnaces with preheated air, to heat the station's boilers.

Water use

The water used in the station's boilers is taken from the local water supply, but is purified in the station's water treatment plant. In the boilers, the water is super heated to a temperature of 556 °C, before it is piped to the station's turbogenerators. It hits the turbine blades, causing the turbine shaft to rotate at 3,000 rmp. This is connected to a generator, which generates electricity at 17 kilovolt (kV). The steam is reheated and then fed to intermediate and low pressure turbines.

After use, the steam is then condensed back into water, using a cooling medium; water from the Firth of Forth. 30 million gallons of water are used for cooling purposes every hour. It is then discharged back into the Firth of Forth.

Ash use and removal

The burning of coal in power stations generates a lot of ash and dust. The station's electrostatic precipitators capture fly ash from the flue gases, preventing them from entering the atmosphere. Bottom ash is also produced by the station. Ash from the station is sold through the ScotAsh company, a joint venture between Scottish Power and Blue Circle. It is used in the construcion industry and in products such as grout and cement. Any remaining ash is piped to the large lagoons in the nearby town of Musselburgh, where it is capped and planted, and used as a nature reserve.

Electricity distribution

The electricity is initially generated at 17 kV. This is stepped up via a transformer to 275 kV for distribution on the National Grid. The electricity is not just distributed to Scotland, but England too, which it is connected to via a double circuit overhead line, operating at 275 kV and 400 kV, to Stella near Newcastle upon Tyne.

Specification

The Cockenzie Coal Power Plant occupies a 24 hectare site. It generates electricity using four 300 megawatt (MW) generating units, for a peak supply of 1200 MW.

Cockenzie Coal Power Plant
Country Scotland
Locale Cockenzie
Status Operational
Commission date 1967
Operator(s) South of Scotland Electricity Board
(1967-1991)
Scottish Power
(1991-present)

Power station information
Primary fuel Coal
Secondary fuel Biomass

Power generation information
Installed capacity 1,200 MW

Longannet coal power plant

Longannet coal power station is a large coal-fired power station in Fife capable of co-firing biomass, natural gas and sludge. The station is situated on the north bank of the Firth of Forth, near Kincardine on Forth. Its generating capacity of 2,400 megawatts is the highest of any power station in Scotland. The station began generating electricity in 1970, and when in became fully operational, it was the largest coal-fired station in Europe. It is now the third largest, after Bełchatów in Poland and Drax in England.

The Longannet coal power station was opened in 1973 and operated by the South of Scotland Electricity Board, until 1991 when its operation was handed over to Scottish Power following privatisation. The station is a regional landmark, dominating the Forth skyline with its 183 m (600 ft) chimney stack. Like most power stations in Scotland Longannet lacks cooling towers. Instead it uses water from the River Forth for cooling.

Electricity generation

The Longannet coal power station consumes up to 4,500,000 tonnes of coal each year. Coal is delivered either by road or rail to the station's coal store, which has the capacity to hold up to 2,000,000 tonnes. Coal is fed from the coal store to the power station by a conveyor belt which is capable of carrying 3,500 tonnes of coal per hour. Coal is fed into bunkers inside the station's boiler house. These feed the station's pulverisers which supply the boilers' burners with fuel. Each of the pulverisers are capable of pulverising 40 tonnes of coal an hour. There are eight pulverisers per each of the station's four Foster Wheeler boilers. These use low NOx burners made by ABB Combustion Ltd. Each boiler provides steam for two 300 megawatt General Electric Company turbo generators.

Coal supply

Coal was originally supplied directly by conveyor belt from the neighbouring Longannet Colliery. This was the last deep mine in Scotland. It closed in 2002. The station is still supplied by Scotland's open cast mines. Much of the station's coal must now be imported, the majority via the former British Steel ore loading facility at Hunterston Terminal in Ayrshire. Onward transport is by rail and the level of traffic required to supply Longannet's fuel demand has caused extreme congestion on the Scottish rail network. An alternative route, the Stirling-Alloa-Kincardine rail link, at the mouth of the river Forth was reopened in 2008.

Cooling system

Water is taken for the station's cooling condensers from the Firth of Forth at a rate of 327,000m3 per hour. The water is passed through coarse screens and then circulated by four electrically driven pumps. Once circulated through the station's condensers (which cool the turbines' exhaust heat), the water is discharged into a mile long cooling channel, where heat is dissipated with no harmful effect before reaching a wide part of the Forth.

Electrostatic precipitators and sulphur trioxide conditioning

The Longannet coal power station is fitted with electrostatic precipitators (ESP) to reduce the stations particulate emissions. In the late 1980s the station's units were fitted with sulphur trioxide (SO3) conditioning equipment to lower the fly ash's electrical resistivity. This was to ensure the station maintained allowable particulate emissions. Between 1989 and 1994 the station's ESPs were given a major refurbishment. This meant that the SO3 conditioning equipment didn't need to be operated as frequently to maintain the allowed level of particulate emissions. This is beneficial as SO3 is seen as a hazardous substance.

NOx reduction

In 1994, the Longannet coal power station was awarded funding from the European Commission under the THERMIE Demonstration Programme. With this money, Unit 2 at the station was retrofitted with Gas-reburn Technology. This is the largest scale application of this technology in the world. In this process, natural gas is injected into the boiler. This cuts NOx emissions from Unit 2 by 50%, as well as giving a reduction in CO2 and SO2 emissions. Also in 1996, all of the station's boilers were fitted with Low NOx burners. This reduced the station's NOx emissions by 40%.

Environmental impact

In 2003, Longannet coal power station was named as Scotland's biggest polluter in a report by the Scottish Environment Protection Agency (SEPA). The station produces up to 4,350 tonnes of ash per day. This is piped to ash lagoons on the nearby Preston Island, where it is stored in former salt pans. This is then landscaped and used to reclaim the land from the Firth of Forth.

To improve environmental emissions, Longannet is now fitted with 'Low-NOx' burners to limit the formation of oxides of nitrogen and a 'Gas Reburn system' that uses natural gas to convert NOx into nitrogen and water vapour. Longannet also burns up to 65,000 tonnes of treated and dried sewage sludge per year, which has a similar calorific value to low-quality brown coal. In 2005, a judge ruled the burning of sludge as illegal, but the SEPA continues to allow Scottish Power to burn the sludge illegally as part of an agreement which requires Scottish Power to construct, and have in operation, a biomass plant in 2010.

In 2007 the WWF named Europe's 30 most climate polluting power stations in absolute terms; of these, Longannet was the most polluting in the UK (relative to power output).

The UK's first ever carbon capture and storage (CCS) unit was commissioned at the station in 2009.